Photovoltaic power station, Aprilovo
Investor: Aprilovo Solar ltd.
Plant size: 72,9 kWp
Assembly Racks: Static
Solar panels: Polycrystalline, made by Innotech Solar.
Inverters: Powador 30.0 TL3
Location: Aprilovo, Galabovo Municipality
Services: Solar radiation audit and project.
Stage: Finished.
Image Gallery
View the embedded image gallery online at:
https://www.motto-engineering.com/en/references/item/328-fotovoltaichna-tzentrala-s-aprilovo2#sigProGalleria6de5d06329
https://www.motto-engineering.com/en/references/item/328-fotovoltaichna-tzentrala-s-aprilovo2#sigProGalleria6de5d06329